VPSie home
Move and grow

Migrate from OpenStack

Move instances from an OpenStack project to VPSie with an application credential, one server at a time, without changing the source project.

OpenStack to VPSie at a glance

The facts that decide how the first server moves.

TopicDetail
What movesInstances in an OpenStack project.
How VPSie reads itWith an application credential for the project, which VPSie uses to read the instances.
StatusAvailable by ticket
CutoverCold migration: the instance is powered off while its disks are copied.
The sourceRead, never changed. A failed or canceled migration removes everything it created.

Four steps, the same for every source

Follow every phase and the bytes copied on the Migrations page, and cancel at any time.

  1. 1Add the sourceChoose the VPSie data center and the source type. For OpenStack, use the method on this page.
  2. 2Power off and startPower the machine off, then choose the plan, network options and an SSH key or password.
  3. 3Watch the copyVPSie copies the disks, checks them block by block, installs drivers and the agent, and sets up the network.
  4. 4Test, then switchStart the new server beside the original, test it, then move users and DNS. Delete the source when you are done.

Before you start

What to prepare for OpenStack, and what changes on the other side.

Prepare

  • Ask VPSie Support to turn the OpenStack source on for your account. It is available by ticket.
  • Create an application credential for the project and keep it for the Add source step.
  • List the instances to move, with their volumes and networks.
  • Choose the VPSie data center, plan and network for each server.

What changes after the move

  • Floating IPs, security groups and Neutron networks do not carry over. Recreate the rules with VPSie firewall groups and networks.
  • Cloud-init data from the source is not the same as the VPSie setup, so check login keys after the first start.
  • VPSie installs the drivers and the VPSie agent on the new server and sets up its network.
  • The new server gets a new address unless you plan otherwise: lower your DNS time-to-live before the switch.

Limits for OpenStack servers

The same limits the migration tool enforces.

Limit

Secure Boot and virtual TPM contents are not carried over.

Limit

Instances are copied one at a time and cannot be powered, resized or deleted on VPSie until the copy ends.

Plan the move in waves

A short plan keeps the first move small and the next ones fast.

Start with one server that is easy to roll back, such as a test or staging machine from OpenStack. Run the full path once: add the source, copy, start the new server beside the original, test it and switch. Note how long the copy takes for your disk size and network, because that time sets the length of the cutover window for the larger servers.

Then group the remaining servers by application, so that a web tier, its database and its jobs move in the same window. Keep the source powered off but intact until the new server has run a full business cycle. Lower the DNS time to live a day before the switch, and agree who checks the application after the move. If something looks wrong, the original is still there, and you can stop and go back.

If the list is long or the downtime allowance is short, ask for migration help. We plan the waves with you, run the first one beside your team and hand over a checklist for the rest.

Questions about moving from OpenStack

What does VPSie need from OpenStack?

An application credential for the project. The migration datasheet lists no other access.

Does my OpenStack project change?

No. VPSie reads it only.

Can I go back?

Yes. Stop any VPSie server and export it as RAW, QCOW2 or OVA, to a download or a bucket in the same data center. Export is charged per exported GB, once.

Can I use the server while it migrates?

The new server cannot be powered, resized, deleted or restored until the migration finishes.

Moving from OpenStack?

Tell us how many servers and how much data. We will help plan the waves.