Migrate from Nutanix
Copy virtual machines from a Nutanix AHV cluster to VPSie through the VPSie Connect appliance, one server at a time, with the source left untouched.
Nutanix to VPSie at a glance
The facts that decide how the first server moves.
- Source
- Nutanix
- Type
- Hypervisor
- Read by
- VPSie Connect appliance
- Status
- Available by ticket
- Source machine
- Read only, powered off
| Topic | Detail |
|---|---|
| What moves | Virtual machines running on Nutanix AHV. |
| How VPSie reads it | Through the VPSie Connect appliance, which reads the VMs from your Nutanix cluster. |
| Status | Available by ticket |
| Cutover | Cold migration: the VM is powered off while its disks are copied. Plan one short window per server. |
| The source | Read, never changed. A failed or canceled migration removes everything it created. |
Four steps, the same for every source
Follow every phase and the bytes copied on the Migrations page, and cancel at any time.
- 1Add the sourceChoose the VPSie data center and the source type. For Nutanix, use the method on this page.
- 2Power off and startPower the machine off, then choose the plan, network options and an SSH key or password.
- 3Watch the copyVPSie copies the disks, checks them block by block, installs drivers and the agent, and sets up the network.
- 4Test, then switchStart the new server beside the original, test it, then move users and DNS. Delete the source when you are done.
Before you start
What to prepare for Nutanix, and what changes on the other side.
Prepare
- Ask VPSie Support to turn the Nutanix source on for your account. It is available by ticket.
- Set up the VPSie Connect appliance that reads your cluster.
- Check each VM against the limits on this page: 31 disks of 2 TiB at most, no volume groups, no Secure Boot.
- Choose the VPSie data center, plan, network and an SSH key or password for each server.
What changes after the move
- Nutanix guest tools are not needed on the new platform. Remove them and check drivers inside the guest after the import.
- VPSie installs the drivers and the VPSie agent on the new server and sets up its network.
- The new server gets a new address unless you plan otherwise: lower your DNS time-to-live before the switch.
Limits for Nutanix servers
The same limits the migration tool enforces.
Limit
Up to 31 disks per VM, each up to 2 TiB.
Limit
Volume groups are not moved. Copy their data another way first.
Limit
Secure Boot is not supported for Nutanix VMs.
Plan the move in waves
A short plan keeps the first move small and the next ones fast.
Start with one server that is easy to roll back, such as a test or staging machine from Nutanix. Run the full path once: add the source, copy, start the new server beside the original, test it and switch. Note how long the copy takes for your disk size and network, because that time sets the length of the cutover window for the larger servers.
Then group the remaining servers by application, so that a web tier, its database and its jobs move in the same window. Keep the source powered off but intact until the new server has run a full business cycle. Lower the DNS time to live a day before the switch, and agree who checks the application after the move. If something looks wrong, the original is still there, and you can stop and go back.
If the list is long or the downtime allowance is short, ask for migration help. We plan the waves with you, run the first one beside your team and hand over a checklist for the rest.
Questions about moving from Nutanix
Why is Nutanix available only by ticket?
The Nutanix source is turned on for your account by VPSie Support, so the Connect appliance can be set up with you. Open a ticket from the console.
Can I keep the VM running during the copy?
No. Cold migration copies a powered-off server. Freeze writes, power the VM off, then start the migration.
Can I go back?
Yes. Stop any VPSie server and export it as RAW, QCOW2 or OVA, to a download or a bucket in the same data center. Export is charged per exported GB, once.
Can I use the server while it migrates?
The new server cannot be powered, resized, deleted or restored until the migration finishes.
Other platforms and next steps
All migration sources Migration help Migrate from VMware VMware alternative Private cloud Multi-cloud management
Moving from Nutanix?
Tell us how many servers and how much data. We will help plan the waves.