VPSie home

Migration help

A plain path from your first server list to a retired platform, with the checks that make each step safe.

Help at every stage

You can run a move yourself from the console, or ask VPSie to walk it with you.

VPSie Migrate is built so that a move is safe to repeat: nothing is installed on the source, the original stays untouched, and each copy is tested before you switch. This page is the practical side: what to prepare, what you can ask for and where to read more.

SourcevCenter, ESXi, imageVPSie Migratereads, never changesNew serverdrivers + agentTest the copy beside the original, then switch users and DNS.

Drawn diagram. Source types and limits are listed on the migration page.

Supported sources and limits Move off VMware

Six steps from first list to retired platform

The same order works for ten servers and for a data center.

Assess

List the servers, their size, their dependencies and who owns each one. The console shows the sources enabled for your account.

Plan waves

Start with small, well-understood workloads. Group servers that must move together.

Copy

VPSie Migrate copies each powered-off server. The source is only read. A failed attempt removes what it created.

Test

Start the copy beside the original, check the application, the network and the logins.

Switch

Move users and DNS to the new server. Keep the old one until you are sure.

Retire

Switch off the old platform when the last wave is stable.

Plan the order

Waves keep each change small enough to undo.

Wave 1small, simpleWave 2core appsWave 3data and edgeRetireold platform

A first wave of low-risk servers proves the network, the DNS change and your own checklist. Later waves carry the applications people notice. The old platform stays as a fallback until the last wave is stable.

Before you start: a checklist

Short, and worth doing even for one server.

  • Inventory: server, CPU, memory, disks, operating system and owner
  • Source access: a read-only user for vCenter, or the disk image for other platforms
  • Target location chosen, with the networks and firewall rules you need
  • IP and DNS plan: which addresses change, and the lowest DNS time-to-live you can set
  • Licenses you bring (operating system, database) noted per server
  • Backup of the source taken before the first copy
  • A test plan: what to check on the new server before users move
  • A rollback rule: who decides, and by when

Where help comes from

Knowledge base

Step-by-step guides for each source, including provider guides for several hosting companies.

  • Written for each source type

Support tickets

Open a ticket from the console if a copy stops, a source is not listed or a limit blocks you.

  • Sources marked "by ticket" are turned on by Support

Talk to an expert

Agree how much help you want for a larger move: planning, waves, or a tested runbook. Scope and price are agreed in writing first.

  • For estates beyond a few servers

Questions

Does the source server change?

No. VPSie reads it. A powered-off server is copied; the original stays as it was until you retire it.

Can I move servers that are not on VMware?

Yes. Hyper-V, Proxmox, public-cloud servers and others come in as disk images or through a rescue-mode route. The migration page lists every source.

What if a copy fails?

The failed attempt removes everything it created, and you can start it again. Open a ticket if it repeats.

Do I need downtime?

Cold migration copies a powered-off server, so plan a short window per server. Testing the copy before you switch keeps the final change small.

Can I go back?

Yes. The original keeps running until you switch each server, and you can export any stopped server from VPSie as RAW, QCOW2 or OVA.

How is larger-move help agreed?

Talk to an expert. Scope and price are agreed in writing before work starts.

What we need from you

A short list answered once saves a round of questions later.

A source we can read

For vCenter 7.0 or later, a dedicated read-only user, and your confirmation of the certificate. For other platforms, the disk image (OVA, VMDK, VHD, VHDX, QCOW2 or raw) or a server you can start in rescue mode.

The target location

The data center where each server should run, and the network and firewall rules it needs when it arrives.

An owner per server

Someone who can test the application and say it is good, because only the owner can judge that.

A window and a rollback rule

Cold migration copies a powered-off server, so each server needs a short window and a named person who can decide to go back.

A realistic timeline

Time depends on disk size and your bandwidth, so treat these as the shape of a plan, not a promise.

PhaseWhat happensWho acts
PrepareInventory, access, target network, DNS plan and backup of the sourceYou, with Support if you ask
First waveCopy a few small servers, test them, switch one, review the checklistYou and VPSie Migrate
Main wavesMove the applications people notice, one group at a timeYou
SettleWatch the new servers, then delete sources after the agreed quiet periodYou

The Migrations page shows the phase and the bytes copied for every server, and you can cancel a copy at any time.

Known limits and risks

Read these before the first wave. They are the limits the tool enforces.

Disk size

Disks up to 1 TiB each are imported by the tool. Larger disks need a planned approach, so ask us before the first wave.

Secure Boot and vTPM

Secure Boot state and vTPM contents are not carried across. A machine that depends on them needs to be re-enrolled after the move.

Guest tools and drivers

VMware guest tools are not needed on the new platform. Remove them and check drivers inside the guest after the import.

Data changing during the copy

A powered-off copy is a point in time. Anything written to the source after it was stopped is not in the copy, so freeze writes before you start.

Addresses and DNS

Servers get new addresses unless you plan otherwise. Lower the DNS time-to-live early so the switch is quick.

Sources by ticket

Nutanix and OpenStack sources are turned on by Support for your account. Ask early.

Related pages

Each page has the detail behind the line above.

Migration Migrate from VMware Backup Support