Migration help
A plain path from your first server list to a retired platform, with the checks that make each step safe.
Help at every stage
You can run a move yourself from the console, or ask VPSie to walk it with you.
VPSie Migrate is built so that a move is safe to repeat: nothing is installed on the source, the original stays untouched, and each copy is tested before you switch. This page is the practical side: what to prepare, what you can ask for and where to read more.
Drawn diagram. Source types and limits are listed on the migration page.
Six steps from first list to retired platform
The same order works for ten servers and for a data center.
Assess
List the servers, their size, their dependencies and who owns each one. The console shows the sources enabled for your account.
Plan waves
Start with small, well-understood workloads. Group servers that must move together.
Copy
VPSie Migrate copies each powered-off server. The source is only read. A failed attempt removes what it created.
Test
Start the copy beside the original, check the application, the network and the logins.
Switch
Move users and DNS to the new server. Keep the old one until you are sure.
Retire
Switch off the old platform when the last wave is stable.
Plan the order
Waves keep each change small enough to undo.
A first wave of low-risk servers proves the network, the DNS change and your own checklist. Later waves carry the applications people notice. The old platform stays as a fallback until the last wave is stable.
Before you start: a checklist
Short, and worth doing even for one server.
- Inventory: server, CPU, memory, disks, operating system and owner
- Source access: a read-only user for vCenter, or the disk image for other platforms
- Target location chosen, with the networks and firewall rules you need
- IP and DNS plan: which addresses change, and the lowest DNS time-to-live you can set
- Licenses you bring (operating system, database) noted per server
- Backup of the source taken before the first copy
- A test plan: what to check on the new server before users move
- A rollback rule: who decides, and by when
Where help comes from
Knowledge base
Step-by-step guides for each source, including provider guides for several hosting companies.
- Written for each source type
Support tickets
Open a ticket from the console if a copy stops, a source is not listed or a limit blocks you.
- Sources marked "by ticket" are turned on by Support
Talk to an expert
Agree how much help you want for a larger move: planning, waves, or a tested runbook. Scope and price are agreed in writing first.
- For estates beyond a few servers
Questions
Does the source server change?
No. VPSie reads it. A powered-off server is copied; the original stays as it was until you retire it.
Can I move servers that are not on VMware?
Yes. Hyper-V, Proxmox, public-cloud servers and others come in as disk images or through a rescue-mode route. The migration page lists every source.
What if a copy fails?
The failed attempt removes everything it created, and you can start it again. Open a ticket if it repeats.
Do I need downtime?
Cold migration copies a powered-off server, so plan a short window per server. Testing the copy before you switch keeps the final change small.
Can I go back?
Yes. The original keeps running until you switch each server, and you can export any stopped server from VPSie as RAW, QCOW2 or OVA.
How is larger-move help agreed?
Talk to an expert. Scope and price are agreed in writing before work starts.
What we need from you
A short list answered once saves a round of questions later.
A source we can read
For vCenter 7.0 or later, a dedicated read-only user, and your confirmation of the certificate. For other platforms, the disk image (OVA, VMDK, VHD, VHDX, QCOW2 or raw) or a server you can start in rescue mode.
The target location
The data center where each server should run, and the network and firewall rules it needs when it arrives.
An owner per server
Someone who can test the application and say it is good, because only the owner can judge that.
A window and a rollback rule
Cold migration copies a powered-off server, so each server needs a short window and a named person who can decide to go back.
A realistic timeline
Time depends on disk size and your bandwidth, so treat these as the shape of a plan, not a promise.
| Phase | What happens | Who acts |
|---|---|---|
| Prepare | Inventory, access, target network, DNS plan and backup of the source | You, with Support if you ask |
| First wave | Copy a few small servers, test them, switch one, review the checklist | You and VPSie Migrate |
| Main waves | Move the applications people notice, one group at a time | You |
| Settle | Watch the new servers, then delete sources after the agreed quiet period | You |
The Migrations page shows the phase and the bytes copied for every server, and you can cancel a copy at any time.
Known limits and risks
Read these before the first wave. They are the limits the tool enforces.
Disk size
Disks up to 1 TiB each are imported by the tool. Larger disks need a planned approach, so ask us before the first wave.
Secure Boot and vTPM
Secure Boot state and vTPM contents are not carried across. A machine that depends on them needs to be re-enrolled after the move.
Guest tools and drivers
VMware guest tools are not needed on the new platform. Remove them and check drivers inside the guest after the import.
Data changing during the copy
A powered-off copy is a point in time. Anything written to the source after it was stopped is not in the copy, so freeze writes before you start.
Addresses and DNS
Servers get new addresses unless you plan otherwise. Lower the DNS time-to-live early so the switch is quick.
Sources by ticket
Nutanix and OpenStack sources are turned on by Support for your account. Ask early.
Related pages
Each page has the detail behind the line above.