VPSie home
Move and grow

Migrate from Google Cloud

Move Google Cloud servers to VPSie as exported disk images, or through the rescue-mode route, and test each copy before you switch.

Google Cloud to VPSie at a glance

The facts that decide how the first server moves.

TopicDetail
What movesCompute Engine instances.
How VPSie reads itExport a disk image from Google Cloud and upload it or give VPSie an https address. The rescue-mode route is the other way.
StatusDisk image
CutoverCold migration: stop the server, export its disk, import it. The original stays in Google Cloud until you delete it.
The sourceRead, never changed. A failed or canceled migration removes everything it created.

Four steps, the same for every source

Follow every phase and the bytes copied on the Migrations page, and cancel at any time.

  1. 1Add the sourceChoose the VPSie data center and the source type. For Google Cloud, use the method on this page.
  2. 2Power off and startPower the machine off, then choose the plan, network options and an SSH key or password.
  3. 3Watch the copyVPSie copies the disks, checks them block by block, installs drivers and the agent, and sets up the network.
  4. 4Test, then switchStart the new server beside the original, test it, then move users and DNS. Delete the source when you are done.

Before you start

What to prepare for Google Cloud, and what changes on the other side.

Prepare

  • Stop the server and export its disk as an image. Google Cloud can export a disk as an image file to a storage bucket. VPSie can fetch the file from an https address.
  • Check the image format: VPSie takes OVA, VMDK, VHD, VHDX, QCOW2 and raw files.
  • Check your source account for data-transfer charges when the image leaves Google Cloud.
  • Choose the VPSie data center, plan and network for each server.

What changes after the move

  • Cloud-specific agents and metadata services from Google Cloud do not exist on VPSie. Remove the agent and check drivers inside the guest.
  • Security groups and virtual networks do not carry over. Recreate them with VPSie firewall groups and networks.
  • VPSie installs the drivers and the VPSie agent on the new server and sets up its network.
  • The new server gets a new address unless you plan otherwise: lower your DNS time-to-live before the switch.

Limits for Google Cloud servers

The same limits the migration tool enforces.

Limit

Up to 1 TiB per file, three uploads at once, unless your account is set lower.

Limit

Compressed or encrypted images are refused.

Limit

Secure Boot and virtual TPM contents are not carried over.

Plan the move in waves

A short plan keeps the first move small and the next ones fast.

Start with one server that is easy to roll back, such as a test or staging machine from Google Cloud. Run the full path once: add the source, copy, start the new server beside the original, test it and switch. Note how long the copy takes for your disk size and network, because that time sets the length of the cutover window for the larger servers.

Then group the remaining servers by application, so that a web tier, its database and its jobs move in the same window. Keep the source powered off but intact until the new server has run a full business cycle. Lower the DNS time to live a day before the switch, and agree who checks the application after the move. If something looks wrong, the original is still there, and you can stop and go back.

If the list is long or the downtime allowance is short, ask for migration help. We plan the waves with you, run the first one beside your team and hand over a checklist for the rest.

Questions about moving from Google Cloud

Is there a connector for Google Cloud?

No. Google Cloud servers come in as disk images or through the rescue-mode route, as the migration page lists.

What if the disk is larger than 1 TiB?

Ask us before the first wave. Larger disks need a planned approach.

Can I go back?

Yes. Stop any VPSie server and export it as RAW, QCOW2 or OVA, to a download or a bucket in the same data center. Export is charged per exported GB, once.

Can I use the server while it migrates?

The new server cannot be powered, resized, deleted or restored until the migration finishes.

Moving from Google Cloud?

Tell us how many servers and how much data. We will help plan the waves.